Post Frame Shop – Backfill

      Comments Off on Post Frame Shop – Backfill

Since I’ve been held up waiting on materials, I spent three very full days last week backfilling around the shop and doing other yardwork with Beth (filling in low spots and sowing grass seed). Since I have a surplus of dirt, I also offered to fill in low spots in both adjoining neighbor’s yards. My missing steel panels arrived this morning, but rain is forecast most of the week, so I’ll work inside hanging ceiling joists and finishing the horizontal track for the 16′ rollup door.